Source record
References
The numbered standards, books, regulations, papers, and technical sources cited throughout the compendium.
The entries identify the editions used in the text. A publication year is not a technical review date. For online regulations, consult the issuing authority and the relevant revision.
[1]
Accident Investigation Board Norway, “Report on the railway accident at nykirke station on the vestfold line, 15 february 2012,” Accident Investigation Board Norway, 2013/02, 2013.
[2]
Administrador de Infraestructuras Ferroviarias, “Network statement 2020,” ADIF, 2020. Available: https://www.adif.es/documents/20124/7076924/book_ADIF_NS_V0_2020_24092020.pdf/78e4597f-4890-b06e-cf9c-233ddaeaeb27
[3]
Administrador de Infraestructuras Ferroviarias, “NAP 1-2-1.0: Metodología para el diseño del trazado ferroviario,” ADIF, 2024. Available: https://www.adif.es/documents/20124/35603770/NAP1210_ED2_FC1.pdf/31ffa7d5-31cd-10f3-3815-99b9cf88ba48
[4]
C. Andersson and A. Johansson, “Prediction of rail corrugation generated by three-dimensional wheel–rail interaction,” Wear, vol. 257, no. 3–4, pp. 423–434, 2004, doi: 10.1016/j.wear.2004.01.006.
[5]
E. Andersson, M. Berg, and S. Stichel, Rail vehicle dynamics. Stockholm: KTH Royal Institute of Technology, 2014.
[6]
Bane NOR, “Bane NOR technical regulations: Maintenance work in continuously welded track.” https://trv.banenor.no/wiki/Overbygning/Vedlikehold/Vedlikeholdsarbeider_i_helsveist_spor.
[7]
Bane NOR, “Bane NOR technical regulations: substructure.” https://trv.banenor.no/wiki/Underbygning.
[8]
Bane NOR, “Bane NOR technical regulations: Substructure, drainage.” https://trv.banenor.no/wiki/Underbygning/Prosjektering_og_bygging/Drenering.
[9]
Bane NOR, “Bane NOR technical regulations: Substructure, frost protection.” https://trv.banenor.no/wiki/Underbygning/Prosjektering_og_bygging/Frost.
[10]
Bane NOR, “Bane NOR technical regulations: superstructure.” https://trv.banenor.no/wiki/Overbygning.
[11]
Bane NOR, “Bane NOR technical regulations: Superstructure, construction of continuously welded track.” https://trv.banenor.no/wiki/Overbygning/Bygging/Helsveist_spor.
[12]
Bane NOR, “Bane NOR technical regulations: Superstructure, design of continuously welded track.” https://trv.banenor.no/wiki/Overbygning/Prosjektering/Helsveist_spor.
[13]
Bane NOR, “Bane NOR technical regulations: Superstructure, maintenance of rails.” https://trv.banenor.no/wiki/Overbygning/Vedlikehold/Skinner.
[14]
Bane NOR, “Bane NOR technical regulations: tunnels.” https://trv.banenor.no/wiki/Tunneler.
[15]
Bane NOR, “El 18 på Flåmsbana.” https://oppslagsverk.banenor.no/jernbanekompetanse/rullende-materiell/el-18-pa-flamsbana/.
[16]
Bane NOR, “Jernbanekompetanse: Aksialkrefter i helsveist spor.” Bane NOR Oppslagsverk.
[17]
Bane NOR, “Jernbanekompetanse: Condition monitoring and track quality.” https://oppslagsverk.banenor.no/jernbanekompetanse/overbygning/vedlikehold/tilstandskontroll/.
[18]
Bane NOR, “Jernbanekompetanse: Sporets sidemotstand.” Bane NOR Oppslagsverk.
[19]
Bane NOR, “Jernbanekompetanse: sporgeometri.” https://oppslagsverk.banenor.no/jernbanekompetanse/overbygning/sporets-trase/sporgeometri/.
[20]
Bane NOR, “Jernbanekompetanse: sporstoppere.” https://oppslagsverk.banenor.no/jernbanekompetanse/overbygning/sporets-komponenter/sporstoppere/.
[21]
Bane NOR, “Nytt dobbeltspor: Sandbukta–moss–såstad.” https://www.banenor.no/prosjekter/alle-prosjekter/nytt-dobbeltspor-sandbukta-moss-sastad/.
[22]
Bane NOR, “Vedlegg 4: ytelsesordning.” https://oppslagsverk.banenor.no/network-statement/ast/vedlegg-4-ytelsesordning/.
[23]
Bane NOR, “Førers regelbok Bane NOR, STY-603526.” https://www.banenor.no/siteassets/bane-nor-sf/leverandor/krav-og-sikkerhet/regler-og-arbeidsprosesser/sty-603526.pdf, 2024.
[24]
Bane NOR, “Instruks for betjening av fjernstyringsanleggene ved Øst og sør-vest trafikkstyringssentraler (vicos).” https://orv.banenor.no/signalanlegg/fjernstyringsinstrukser-operatorveiledninger/fjernstyringsinstrukser/betjening-av-fjernstyringsanlegg-ost-sor-vest/, 2024.
[25]
Bane NOR, “Instruks for betjening av fjernstyringsanleggene ved TSS nord (railmanager).” https://orv.banenor.no/signalanlegg/fjernstyringsinstrukser-operatorveiledninger/fjernstyringsinstrukser/betjening-av-fjernstyringsanlegg-nord/, 2024.
[26]
Bane NOR, “Norske dynamiske mål, NO1 og NO2.” https://oppslagsverk.banenor.no/globalassets/felles-for-oppslagsverk-og-regelverk/nedlasting/no1_no2_dokument_no_0424.pdf, 2024.
[27]
Bane NOR, “Capacity allocation, network statement 2026.” Bane NOR Network Statement, 2025.
[28]
Bane NOR, “Kort om ERTMS.” Bane NOR project overview and rollout context. Accessed 16 September 2026.
[29]
Bane NOR, “InfraStatus 2024.” https://www.banenor.no/contentassets/4a5e76e87edc4f1ea0514b6e274bc9c1/infrastatus-2024.pdf, 2025.
[30]
Bane NOR, “Network statement 2026.” https://oppslagsverk.banenor.no/en/network-statement/network-statement-2026/, 2025.
[31]
Bane NOR, “Network statement 2027.” https://oppslagsverk.banenor.no/en/network-statement/2027/, 2025.
[32]
Bane NOR, “Operativt regelverk, SJN 2.18.1: Overbygningsklasse, aksellast og maks hastighet.” https://orv.banenor.no/strekningsbeskrivelse-for-jernbanenettet/tillegg/artikler/overbygningsklasse-aksellast-metervekt-og-lasteprofil/, 2025.
[33]
Bane NOR, “Planlegging, gjennomføring og rapportering av drift og vedlikehold infrastruktur.” Bane NOR document register, search for STY-605097, 2025. The register provides the current revision.
[34]
Bane NOR, “Planoverganger.” https://oppslagsverk.banenor.no/jernbanekompetanse/overbygning/planoverganger/, 2025.
[35]
Bane NOR, “Utforming av tunnelprofiler.” Bane NOR Oppslagsverk, 2025.
[36]
Bane NOR, “Bane NOR årsrapport 2025.” Bane NOR annual report PDF, 2026.
[37]
Bane NOR, “Bane NOR network statement: Annex 2, traffic data to bane NOR.” https://oppslagsverk.banenor.no/en/network-statement/avtale-om-sportilgang-og-bruk-av-tjenester-ast/traffic-data-to-bane-nor/, 2026.
[38]
Bane NOR, “Bane NOR technical regulations: Catalogue of rail defects and rail breaks.” https://trv.banenor.no/wiki/Overbygning/Vedlikehold/Skinner/Vedlegg/Katalog_over_feil_og_brudd_i_skinner, 2026.
[39]
Bane NOR, “Bane NOR technical regulations: Contact line and contact-line maintenance requirements.” https://trv.banenor.no/wiki/Kontaktledning, 2026.
[40]
Bane NOR, “Bane NOR technical regulations: Contact line foundations, masts and portals.” https://trv.banenor.no/wiki/Kontaktledning/Prosjektering_og_Bygging/Fundamenter%2C_master_og_%C3%A5k, 2026.
[41]
Bane NOR, “Bane NOR technical regulations: Contact line, mechanical design.” https://trv.banenor.no/wiki/Kontaktledning/Prosjektering_og_Bygging/Mekanisk_utforming, 2026.
[42]
Bane NOR, “Bane NOR technical regulations: Profiler og lasttilfeller i Bane NOR.” https://trv.banenor.no/wiki/Underbygning/Prosjektering_og_bygging/Profiler_og_minste_tverrsnitt/Vedlegg/Profiler, 2026.
[43]
Bane NOR, “Bane NOR technical regulations: signalling.” https://trv.banenor.no/wiki/Signal, 2026.
[44]
Bane NOR, “Bane NOR technical regulations: skiltoversikt.” https://trv.banenor.no/wiki/Skilt/Plassering_av_skilt_langs_sporet/Skiltoversikt, 2026.
[45]
Bane NOR, “Bane NOR technical regulations: Substructure, noise barriers.” https://trv.banenor.no/wiki/Underbygning/Prosjektering_og_bygging/St%C3%B8yskjermer, 2026.
[46]
Bane NOR, “Bane NOR technical regulations: Superstructure maintenance, general technical requirements.” https://trv.banenor.no/wiki/Overbygning/Vedlikehold/Generelle_tekniske_krav, 2026.
[47]
Bane NOR, “Bane NOR technical regulations: Superstructure, sleepers appendix.” https://trv.banenor.no/wiki/Overbygning/Prosjektering/Sporkonstruksjoner/Vedlegg/Sviller, 2026.
[48]
Bane NOR, “Bane NOR technical regulations: Superstructure, switches and crossings.” https://trv.banenor.no/wiki/Overbygning/Prosjektering/Sporveksler, 2026.
[49]
Bane NOR, “Bane NOR technical regulations: Superstructure, track constructions.” https://trv.banenor.no/wiki/Overbygning/Prosjektering/Sporkonstruksjoner, 2026.
[50]
Bane NOR, “Bane NOR technical regulations: Track geometry, position and quality.” https://trv.banenor.no/wiki/Overbygning/Vedlikehold/Sporets_geometri%2C_beliggenhet_og_kvalitet, 2026.
[51]
Bane NOR, “Bane NOR technical regulations: Underbygning, profiler og minste tverrsnitt.” https://trv.banenor.no/wiki/Underbygning/Prosjektering_og_bygging/Profiler_og_minste_tverrsnitt, 2026.
[52]
Bane NOR, “Bane NOR technical specification: Switches and crossings.” https://tekniskregelverk.banenor.no/tekniske-spesifikasjoner/overbygning/switches-and-crossings/, 2026.
[53]
Bane NOR, “Dobbeltspor drammen–kobbervikdalen kåret til årets anlegg 2025.” Bane NOR project page, 2026.
[54]
Bane NOR, “ELS710 drivmaskin (ERTMS) (SA-ITD).” https://oppslagsverk.banenor.no/vedlikeholdsprogram/signal/els710-drivmaskin-ertms-sa-itd/, 2026.
[55]
Bane NOR, “Jernbanekompetanse: Minste tverrsnitt og profiler.” https://oppslagsverk.banenor.no/jernbanekompetanse/overbygning/sporets-trase/minste-tverrsnitt-og-profiler/, 2026.
[56]
Bane NOR, “Stoppskilt på strekning med ERTMS.” https://orv.banenor.no/trafikkregler-for-jernbanenettet/kapittel-8/sarlige-skilt-pa-strekning-med-ertms/stoppskilt-pa-strekning-med-ertms/, 2026.
[57]
Bane NOR, “Trafikkregler for jernbanenettet: Kapittel 8, signaler.” https://orv.banenor.no/trafikkregler-for-jernbanenettet/kapittel-8/, 2026.
[58]
Verification pending. Original citation details: P. Burrage, M. Murray, and N. Lake, “The role of track geometry quality indices in railway track maintenance,” Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, vol. 232, no. 3, pp. 735–747, 2018. The source identity has not been established; do not rely on this record until it is verified.
[59]
Y. Chatkeo, “Die stabilität des eisenbahngleises im bogen mit engen halbmessern bei hohen axialdruckkräften,” PhD thesis, Technische Universität München, München, 1985.
[60]
Comisión de Investigación de Accidentes Ferroviarios, “Informe final sobre el accidente grave ferroviario n.º 0054/2013 ocurrido el día 24.07.2013 en las proximidades de la estación de santiago de compostela,” Ministerio de Fomento, Gobierno de España, IF-240713-200514-CIAF, 2014. Available: https://www.transportes.gob.es/recursos_mfom/pdf/0ADE7F17-84BB-4CBD-9451-C750EDE06170/125127/IF240713200514CIAF.pdf
[61]
Contando Estrelas, “Tragedia en santiago de compostela (b).jpg.” https://commons.wikimedia.org/wiki/File:Tragedia_en_Santiago_de_Compostela_(b).jpg, 2013.
[62]
T. Dahlberg, “Railway track stiffness variations – consequences and countermeasures,” International Journal of Civil Engineering, vol. 8, no. 1, pp. 1–12, 2010.
[63]
N. Dunn and A. Williamson, “Driving monotonous routes in a train simulator: The effect of task demand on driving performance and subjective experience,” Ergonomics, vol. 55, no. 9, pp. 997–1008, 2012, doi: 10.1080/00140139.2012.691994.
[64]
J. Eisenmann, “Schienenkopfbeanspruchung: Vergleich zwischen theorie und praxis,” Eisenbahntechnische Rundschau, vol. 16, no. 10, pp. 355–361, 1967.
[65]
J. Eisenmann, “Die schiene als tragbalken (the rail as a carrying beam),” Eisenbahningenieur, vol. 23, no. 5, pp. 185–190, 1972.
[66]
Verification pending. Original citation details: A. Ekberg and E. Bertheaux, “Rolling contact fatigue of railway wheels and rails – a review,” Fatigue & Fracture of Engineering Materials & Structures, vol. 24, no. 6, pp. 385–402, 2001. The source identity has not been established; do not rely on this record until it is verified.
[67]
Elmagasinet, “Europas mest moderne trafikkstyringssentral.” https://elmagasinet.no/europas-mest-moderne-trafikkstyringssentral/, 2022.
[68]
C. Esveld, Modern railway track, 2nd ed. Zaltbommel, The Netherlands: MRT-Productions, 2001.
[69]
European Commission, “ETCS levels and modes.” https://transport.ec.europa.eu/transport-modes/rail/ertms/what-ertms-and-how-does-it-work/etcs-levels-and-modes_en.
[70]
European Commission, “Commission decision 2002/735/EC concerning the technical specification for interoperability relating to the rolling stock subsystem of the trans-european high-speed rail system.” https://eur-lex.europa.eu/eli/dec/2002/735/oj/eng, 2002. EUR-Lex official text. Historical instrument. Article 6 of Decision 2008/232/EC repealed it, with transitional provisions for specified existing projects.
[71]
European Commission, “Commission regulation (EU) no 1299/2014 on the technical specifications for interoperability relating to the infrastructure subsystem of the rail system in the european union.” https://eur-lex.europa.eu/eli/reg/2014/1299/oj/eng, 2014. EUR-Lex official text. See the consolidated EU text dated 28 September 2023. Norwegian application depends on the relevant national implementation and project provisions.
[72]
European Commission, “Commission regulation (EU) no 1303/2014 concerning the technical specification for interoperability relating to safety in railway tunnels.” https://eur-lex.europa.eu/eli/reg/2014/1303/oj/eng, 2014. EUR-Lex official text. See the consolidated EU text dated 29 January 2024. Norwegian application depends on the relevant national implementation and project provisions.
[73]
European Commission, “Commission Delegated Directive (EU) 2021/1226 of 21 December 2020 amending Annex II to Directive 2002/49/EC as regards common noise assessment methods,” Official Journal of the European Union, L 269, pp. 65–142, 2021. EUR-Lex official text.
[74]
European Commission, “Commission implementing regulation (EU) 2023/1695 on the technical specification for interoperability relating to the control-command and signalling subsystems of the rail system in the european union.” https://eur-lex.europa.eu/legal-content/EN/ALL/?uri=CELEX:32023R1695, 2023. EUR-Lex official text. See the consolidated EU text dated 5 May 2026. Norwegian application depends on the relevant national implementation and project provisions.
[75]
European Committee for Electrotechnical Standardization (CENELEC), “EN 50163: Railway applications – supply voltages of traction systems.” European Committee for Electrotechnical Standardization (CENELEC), 2004. Official catalogue for the cited edition. EN base edition 2004. The catalogue records amendments A1:2007, A2:2020 and A3:2022.
[76]
European Committee for Electrotechnical Standardization (CENELEC), “EN 50122-1: Railway applications – fixed installations – electrical safety, earthing and the return circuit – part 1: Protective provisions against electric shock.” European Committee for Electrotechnical Standardization (CENELEC), 2011. Official catalogue for the cited edition. Historical edition. Superseded by EN 50122-1:2022.
[77]
European Committee for Electrotechnical Standardization (CENELEC), “EN 50119: Railway applications – fixed installations – electric traction overhead contact lines.” European Committee for Electrotechnical Standardization (CENELEC), 2020. Official catalogue for the cited edition.
[78]
European Committee for Electrotechnical Standardization (CENELEC), “EN 50367: Railway applications – fixed installations and rolling stock – criteria to achieve technical compatibility between pantographs and overhead contact line.” European Committee for Electrotechnical Standardization (CENELEC), 2020. Official catalogue for the cited edition. Base edition; amendments A1:2022 and A2:2025 are listed in the catalogue.
[79]
European Committee for Standardization (CEN), “EN 13450: Aggregates for railway ballast.” European Committee for Standardization (CEN), 2002. Official catalogue for the cited edition. The EN base edition is 2002, with corrigendum AC:2004; the catalogue uses the 2007 Estonian adoption date.
[80]
European Committee for Standardization (CEN), “EN 13232-1: Railway applications – track – switches and crossings – part 1: definitions.” European Committee for Standardization (CEN), 2003. Official catalogue for the cited edition. Historical definitions standard. Superseded by EN 13232-1:2023.
[81]
European Committee for Standardization (CEN), “EN 14730-2: Railway applications – track – aluminothermic welding of rails – part 2: Qualification of aluminothermic welders, approval of contractors and acceptance of welds.” European Committee for Standardization (CEN), 2006. Official catalogue for the cited edition. Historical edition. Superseded by EN 14730-2:2021.
[82]
European Committee for Standardization (CEN), “EN 14811: Railway applications – track – special purpose rail – grooved and associated construction.” European Committee for Standardization (CEN), 2006. Official catalogue for the cited edition. Historical base edition. The catalogue includes amendment A1:2009 and records replacement by EN 14811:2019.
[83]
European Committee for Standardization (CEN), “EN 13848-2: Railway applications – track – track geometry quality – part 2: Measuring systems – track recording vehicles.” European Committee for Standardization (CEN), 2006. Official catalogue for the cited edition. Historical edition. Superseded by EN 13848-2:2020.
[84]
European Committee for Standardization (CEN), “EN 14587-2: Railway applications – track – flash butt welding of rails – part 2: New R220, R260, R260Mn and R350HT grade rails by mobile welding machines at sites other than a fixed plant.” European Committee for Standardization (CEN), 2009. Official catalogue for the cited edition. Historical edition. Superseded by EN 14587-2:2024.
[85]
European Committee for Standardization (CEN), “EN 13674-1: Railway applications – track – rail – part 1: Vignole railway rails 46 kg/m and above.” European Committee for Standardization (CEN), 2011. Official catalogue for the cited edition. Base edition; see EN 13674-1:2011+A1:2017 for the amended text.
[86]
European Committee for Standardization (CEN), “EN 13848-4: Railway applications – track – track geometry quality – part 4: Measuring systems – Manual and lightweight devices.” European Committee for Standardization (CEN), 2011. Official catalogue for the cited edition. Historical edition. Superseded by EN 13848-4:2025.
[87]
European Committee for Standardization (CEN), “EN 13231-1: Railway applications – track – acceptance of works – part 1: Works on ballasted track – plain line, switches and crossings.” European Committee for Standardization (CEN), 2013. Official catalogue for the cited edition. Historical edition. Superseded by EN 13231-1:2023.
[88]
European Committee for Standardization (CEN), “EN 13481-1: Railway applications – track – performance requirements for fastening systems – part 1: definitions.” European Committee for Standardization (CEN), 2012. Official catalogue for the cited edition.
[89]
Verification pending. Original citation details: European Committee for Standardization (CEN), “EN 13848-2+A1: Railway applications – track – track geometry quality – part 2: Measuring systems – track recording vehicles, amendment 1.” European Committee for Standardization (CEN), 2012. The source identity has not been established; do not rely on this record until it is verified.
[90]
European Committee for Standardization (CEN), “EN 14363: Railway applications – testing and simulation for the acceptance of running characteristics of railway vehicles – running behaviour and stationary tests.” European Committee for Standardization (CEN), 2016. Official catalogue for the cited edition. Base edition. Later amendments include A1:2018 and A2:2022.
[91]
European Committee for Standardization (CEN), “EN 13848-5: Railway applications – track – track geometry quality – part 5: Geometric quality levels – plain line, switches and crossings.” European Committee for Standardization (CEN), 2017. Official catalogue for the cited edition.
[92]
European Committee for Standardization (CEN), “EN 13848-1:2019: Railway applications – track – track geometry quality – part 1: Characterisation of track geometry.” European Committee for Standardization (CEN), 2019. Official catalogue for the cited edition.
[93]
European Committee for Standardization (CEN), “EN 13715:2020: Railway applications – wheelsets and bogies – wheels – tread profile.” European Committee for Standardization (CEN), 2020. Official catalogue for the cited edition.
[94]
European Committee for Standardization (CEN), “EN 15273:2025 series: Railway applications – gauges, parts 1–4, with CEN/TR 15273-5:2025.” European Committee for Standardization (CEN); Parts 1–4 cover common rules, rolling stock, infrastructure, and the catalogue of defined gauges; Part 5 provides background and worked examples, 2025. Official catalogue for the cited edition.
[95]
European Parliament and Council, “Directive 2002/49/EC relating to the assessment and management of environmental noise.” Official Journal of the European Communities, 2002.
[96]
European Union Agency for Railways (ERA), “System requirements specification – ETCS.” ERA ERTMS page, 2023.
[97]
Eurostat, “Length of electrified railway lines by type of current (rail_if_electri).” https://ec.europa.eu/eurostat/databrowser/view/rail_if_electri/default/table?lang=en, 2026.
[98]
Federal Railroad Administration, “Santiago de compostela derailment, july 2013.” FRA human-factors case study, 2019.
[99]
Federal Railroad Administration, “Aerodynamic assessment and mitigation: Design considerations for high-speed rail,” Federal Railroad Administration, U.S. Department of Transportation, Washington, DC, DOT/FRA/ORD-22/28, 2022. Available: https://railroads.dot.gov/sites/fra.dot.gov/files/2022-07/Arup%20Aero-A.pdf
[100]
Federal Railroad Administration, “Measurement and characterization of track geometry data: Literature review and recommendations for processing of data from FRA ATIP program,” Federal Railroad Administration, U.S. Department of Transportation, 2022. Available: https://rosap.ntl.bts.gov/view/dot/68613/dot_68613_DS1.pdf
[101]
Francis & Lewis International Ltd., “Overhead electrification line cantilever assembly.” https://patents.google.com/patent/WO2015092413A1/en, 2015.
[102]
R. D. Fröhling, “Wheel/rail interface management in heavy haul railway operations – applying science and technology,” Vehicle System Dynamics, vol. 45, no. 7–8, pp. 649–677, 2007, doi: 10.1080/00423110701413797.
[103]
Gilson Company, Inc., “Aggregate abrasion testing: The micro-deval test method.” https://www.globalgilson.com/blog/aggregate-abrasion-testing-micro-deval-test.
[104]
Gilson Company, Inc., “Micro-deval apparatus.” https://www.globalgilson.com/micro-deval-apparatus.
[105]
S. L. Grassie, “Rail corrugation: Characteristics, causes, and treatments,” Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, vol. 223, no. 6, pp. 581–596, 2009, doi: 10.1243/09544097JRRT264.
[106]
S. L. Grassie and J. Kalousek, “Rail corrugation: Characteristics, causes and treatments,” Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, vol. 207, no. 1, pp. 57–68, 1993, doi: 10.1243/PIME_PROC_1993_207_227_02.
[107]
I. Grossoni, P. Hughes, Y. Bezin, A. Bevan, and J. Jaiswal, “Observed failures at railway turnouts: Failure analysis, possible causes and links to current and future research,” Engineering Failure Analysis, vol. 119, p. 104987, 2021, doi: 10.1016/j.engfailanal.2020.104987.
[108]
H. Hertz, “Über die Berührung fester elastischer Körper,” Journal für die reine und angewandte Mathematik, vol. 92, pp. 156–171, 1882.
[109]
X. Huang et al., “Comparative research on vibration characteristics of cast-in-place steel-spring-floating slab track under different subway line conditions,” Applied Sciences, vol. 12, no. 10, p. 5079, 2022, doi: 10.3390/app12105079.
[110]
Humboldt Mfg. Co., “Los angeles abrasion machine.” https://www.humboldtmfg.com/los-angeles-abrasion-machine.html.
[111]
IDS GeoRadar, “SRS SafeRailSystem: Safe railway ballast inspections with ground penetrating radar.” https://idsgeoradar.com/products/ground-penetrating-radar/srs-saferailsystem, 2026.
[112]
INNOTRACK Consortium, “Recommendations and guidelines for track maintenance,” INNOTRACK Deliverable D4.5.2, 2010.
[113]
International Organization for Standardization, “ISO 14837-1: Mechanical vibration – ground-borne noise and vibration arising from rail systems – part 1: General guidance.” International Organization for Standardization, 2005. Official catalogue for the cited edition. ISO confirmed this edition in 2025.
[114]
International Union of Railways (UIC), “Freight Noise Focus: K-blocks.” International Union of Railways (UIC), Oct. 2009.
[115]
International Union of Railways (UIC), “IRS 60650: Railway application – rolling stock – standard designation of axle arrangement on locomotives and multiple-unit sets.” International Union of Railways (UIC), 2016. Official catalogue for the cited edition.
[116]
International Union of Railways (UIC) and Office for Research and Experiments (ORE), “Standardisation of wheel profiles: Recommendations concerning a universal wheel profile adapted to wear (UIC/ORE profile) valid regardless of the wheel diameter and the type of vehicle,” International Union of Railways (UIC), S1002/RP 2/E, 1973.
[117]
S. Iwnicki, Handbook of railway vehicle dynamics. Boca Raton: CRC Press / Taylor & Francis, 2006.
[118]
Jernbaneverket, “Overbygning: Generelle tekniske krav – skinneprofiler og overbygningsklasser,” Jernbaneverket (now Bane NOR), JD 531, Chapter 4, 2007. Available: https://trv.banenor.no/tidligere-utgaver/Gammel%20versjon%20JD5xx%200105%202007/Overbygning/531/T31-0406.pdf
[119]
Jklamo, N299, and Hexalogical, “Europe rail electrification en.svg.” https://commons.wikimedia.org/wiki/File:Europe_rail_electrification_en.svg, 2026.
[120]
E. Kabo and A. Ekberg, “Fatigue initiation in railway wheels—a numerical study of the influence of defects,” Wear, vol. 253, no. 1–2, pp. 26–34, 2002, doi: 10.1016/S0043-1648(02)00079-0.
[121]
J. J. Kalker, “A fast algorithm for the simplified theory of rolling contact,” Vehicle System Dynamics, vol. 11, no. 1, pp. 1–13, 1982, doi: 10.1080/00423118208968684.
[122]
A. Kish, G. Samavedam, and D. Wormley, “Fundamentals of track lateral shift for high-speed rail applications,” United States Department of Transportation, Federal Railroad Administration, 1998. Full report.
[123]
Klima- og miljødepartementet, “Retningslinje for behandling av støy i arealplanleggingen (T-1442/2021).” https://www.regjeringen.no/contentassets/7d2793f6d8254e4b9cc2c4f33592657f/t-1442-2021.pdf, 2021.
[124]
K. Knothe and S. Stichel, Rail vehicle dynamics. Cham: Springer International Publishing, 2017. doi: 10.1007/978-3-319-45376-7.
[125]
S. Lamb, “US derail detail.JPG.” https://commons.wikimedia.org/wiki/File:US_derail_detail.JPG, 2005.
[126]
A. Landex, “Methods to estimate railway capacity and passenger delays,” PhD thesis, Technical University of Denmark, Department of Transport, Kgs. Lyngby, 2008. Available: https://orbit.dtu.dk/en/publications/methods-to-estimate-railway-capacity-and-passenger-delays
[127]
T. Lees, T. Chalmers, D. Burton, E. Zilberg, T. Penzel, and S. Lal, “Psychophysiology of monotonous driving, fatigue and sleepiness in train and non-professional drivers: Driver safety implications,” Behavioral Sciences, vol. 13, no. 10, p. 788, 2023, doi: 10.3390/bs13100788.
[128]
D. Li, J. Hyslip, T. Sussmann, and S. Chrismer, Railway geotechnics. Boca Raton: CRC Press, 2015. doi: 10.1201/b18982.
[129]
B. Lichtberger, “The lateral resistance of the track, part 2,” European Railway Review, pp. 68–71, 2007.
[130]
B. Lichtberger, Track compendium: Formation, permanent way, maintenance, economics. Hamburg: Eurailpress, 2011.
[131]
Lovdata, “Forskrift om begrensning av forurensning (forurensningsforskriften), kapittel 5: Støy.” https://lovdata.no/forskrift/2004-06-01-931/kap5, 2004.
[132]
W. Ma, Y. Fang, T. Li, and M. Shao, “Alleviation effects of hoods at the entrances and exits of high-speed railway tunnels on the micro-pressure wave,” Applied Sciences, vol. 14, no. 2, p. 692, 2024, doi: 10.3390/app14020692.
[133]
H. Meier, “Die verwerfungsgefahr beim lückenlosen vollbahngleis und ihre beseitigung,” PhD thesis, Technische Hochschule München, München, 1934.
[134]
Y. Muhamedsalih, S. Hawksbee, G. Tucker, J. Stow, and M. Burstow, “Squats on the Great Britain rail network: Possible root causes and research recommendations,” International Journal of Fatigue, vol. 149, p. 106267, 2021, doi: 10.1016/j.ijfatigue.2021.106267.
[135]
J. C. O. Nielsen and A. Igeland, “Vertical dynamic interaction between train and track – influence of wheel and track imperfections,” Journal of Sound and Vibration, vol. 187, no. 5, pp. 825–839, 1995, doi: 10.1006/jsvi.1995.0566.
[136]
Nippon Steel Corporation, Rails. Nippon Steel Corporation, 2026. Available: https://www.nipponsteel.com/product/catalog_download/__icsFiles/afieldfile/2026/06/05/K003en.pdf
[137]
R. S. Nordal and A. H. Løhren, “Laboratory and field testings of the new concrete friction sleeper,” in Proceedings of the seventh international conference on the bearing capacity of roads, railways and airfields, 2005.
[138]
Norwegian Geotechnical Institute, “Large quick clay slides in norway.” NGI quick-clay landslides page, 2025.
[139]
Norwegian Geotechnical Institute, “Using the Q-System: Rock mass classification and support design.” NGI Q-system handbook PDF, 2025.
[140]
NTNU, “TBA4225 railway engineering: Catenary systems and design assignment.” Course assignment material, 2024.
[141]
NTNU, “TBA4225 railway engineering: Railway catenary system course material.” Course material, figure 44, 2024.
[142]
NTNU, “TBA4225 railway engineering: Railway catenary system course material.” Course material, figure 63, 2024.
[143]
NTNU, “TBA4225 railway engineering: Railway catenary system course material.” Course material, figures 72–73, 2024.
[144]
NTNU, “TBA4225 railway engineering 2: Kontaktledningssystemer course material.” Course material, figure 11, 2025.
[145]
N. O. E. Olsson, J. A. Langlo, A. Johansen, and O. Torp, Practical project management. Trondheim: Tapir Academic Press, 2011.
[146]
OpenStreetMap contributors, “Sanitago-derailment-rail-map.JPG.” https://commons.wikimedia.org/wiki/File:Sanitago-Derailment-Rail-Map.JPG, 2023.
[147]
OrdinaryHonestHardWorking, “NoiseBarrierRail.JPG.” https://commons.wikimedia.org/wiki/File:NoiseBarrierRail.JPG, 2008. CC BY-SA 4.0.
[148]
V. A. Profillidis, Railway management and engineering, 4th ed. London: Routledge / Taylor & Francis, 2016.
[149]
RailSystem.net, “Axle counter.” https://railsystem.net/axle-counter/, 2017.
[150]
J. W. Ringsberg, H. Bjarnehed, A. Johansson, and L. Josefson, “Rolling contact fatigue of rails – finite element modelling of residual stresses, strains and crack initiation,” Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, vol. 214, no. 1, pp. 7–19, 2000, doi: 10.1243/0954409001531207.
[151]
E. T. Selig and J. M. Waters, Track geotechnology and substructure management. London: Thomas Telford, 1994.
[152]
S. Sharma, Y. Cui, Q. He, R. Mohammadi, and Z. Li, “Data-driven optimization of railway maintenance for track geometry,” Transportation Research Part C: Emerging Technologies, vol. 90, pp. 34–58, 2018, doi: 10.1016/j.trc.2018.02.019.
[153]
Siemens AG, “S 700 K point machine.” https://assets.new.siemens.com/siemens/assets/api/uuid:a0351b96-65f9-43c8-b976-45eee5d9d1d5/s-700-k.pdf, 2008.
[154]
Siemens AG, “Switchguard ELS 710 point machine.” https://assets.new.siemens.com/siemens/assets/api/uuid:1e6e9276-dc87-40c4-a3ff-0c346aa57c9b/switchguard-els-710-en.pdf, 2014.
[155]
Sky News, “Train driver faces trial over crash that killed 80 people near santiago de compostela in spain.” news.sky.com/story/12360814, 2021.
[156]
Standard Norge, “NS 8176: Vibration and shock – measurement of vibration in buildings from land-based transport and guidance to evaluation of its effects on human beings.” Standard Norge, 2017. Official catalogue for the cited edition.
[157]
Teknisk Ukeblad, “Øker kostnadsrammen for jernbaneutbyggingen i moss med flere milliarder.” tu.no article 546912, 2024.
[158]
D. Thompson, Railway noise and vibration: Mechanisms, modelling and means of control. Oxford: Elsevier, 2009.
[159]
TrainSimFan, “Overhead catenary bridge.” https://commons.wikimedia.org/wiki/File:Overhead_catenary_bridge.jpg, 2016.
[160]
H. Wu, X. Shu, and N. Wilson, “Track-Related Research, Volume 5: Flange Climb Derailment Criteria and Wheel/Rail Profile Management and Maintenance Guidelines for Transit Operations,” Transportation Research Board, TCRP Report 71, 2005. Official report PDF.
[161]
K. Tzanakakis, The railway track and its long term behaviour: A handbook for a railway track of high quality, vol. 2. in Springer tracts on transportation and traffic, vol. 2. Berlin, Heidelberg: Springer, 2013. doi: 10.1007/978-3-642-36051-0.
[162]
Verification pending. Original citation details: Union Internationale des Chemins de Fer (UIC), “UIC Code 743R: Turnout geometry: Layout and drawing.” 2000. The source identity has not been established; do not rely on this record until it is verified.
[163]
Union Internationale des Chemins de Fer (UIC), “UIC Code 774-3R: Track/bridge interaction – recommendations for calculations.” 2001. Official catalogue for the cited edition.
[164]
Union Internationale des Chemins de Fer (UIC), “UIC Code 720R: Laying and maintenance of CWR track.” 2005. Official catalogue for the cited edition. Historical leaflet. UIC records its replacement by IRS 71720 in December 2024.
[165]
Union Internationale des Chemins de Fer (UIC), “UIC Code 860: Technical specification for the supply of rails.” 2008. Official catalogue for the cited edition. Historical leaflet. UIC records its withdrawal in September 2022.
[166]
Union Internationale des Chemins de Fer (UIC), “UIC Code 518: Testing and approval of railway vehicles from the point of view of their dynamic behaviour – safety – track fatigue – running behaviour.” 2009. Official catalogue for the cited edition.
[167]
Verification pending. Original citation details: Union Internationale des Chemins de Fer (UIC), “UIC Code 734R: Switches – permissible values for verification at works and during maintenance operations.” 2011. The source identity has not been established; do not rely on this record until it is verified.
[168]
Union Internationale des Chemins de Fer (UIC), “UIC Code 406: capacity.” 2013. Official catalogue for the cited edition.
[169]
Union Internationale des Chemins de Fer (UIC), “UIC Code 714R: Classification of lines for the purpose of track maintenance.” 2014. Official catalogue for the cited edition. Historical leaflet. UIC records its replacement by IRS 70714 in June 2021. The listed 2014 edition date has not been independently confirmed.
[170]
P. Veit and S. Marschnig, “Sustainability in track – a prerequisite for high speed,” Journal of Transportation Technologies, vol. 1, no. 3, pp. 57–65, 2011.
[171]
ViaTech, “Roger 1000.” https://viatech.no/roger-1000/, 2026.
[172]
S. Wang, G. Liu, G. Jing, Q. Feng, H. Liu, and Y. Guo, “State-of-the-art review of ground penetrating radar (GPR) applications for railway ballast inspection,” Sensors, vol. 22, no. 7, p. 2450, 2022, doi: 10.3390/s22072450.
[173]
H. Weinstock, “Wheel climb derailment criteria for evaluation of rail vehicle safety,” in Proceedings of the ASME winter annual meeting, New Orleans, Louisiana, 1984.
[174]
World Health Organization, “Environmental noise guidelines for the European region,” WHO Regional Office for Europe, Copenhagen, 2018.
[175]
A. H. Løhren, CWR: Track with Continuous Welded Rails, TBA4225 Railway Engineering Basic Course, NTNU, autumn 2026. Bane NOR lecture slides, file dated 21 September 2026, 124 pages. Course teaching material.
[176]
Science Museum Group, Two short lengths of fish belly rail. Official source. Accessed 25 September 2026.
[177]
Science Museum Group, Fish-Belly Rail Track. Official source. Accessed 25 September 2026.
[178]
Bane NOR, Teknisk regelverk: Overbygning/Prosjektering/Utfesting og fastmerkenett, 2026-05-18. Official source. Accessed 25 September 2026.
[179]
Bane NOR, Teknisk regelverk: Overbygning/Prosjektering/Ballast. Official source. Accessed 25 September 2026.
[180]
Trafikverket, Frågor och svar om solkurvor. Official source. Accessed 25 September 2026.
[181]
Trafikverket, Nationell arbetsgrupp Solkurvor, Solkurvor 2024: Statistik, analys och handlingsplan, 2025-03-26. Official source. Accessed 25 September 2026.
[182]
Banedanmark, BN1-66-3: Langskinnespor. Spændingsudligning og indgreb i spændingsudlignet spor, 2023-12-06. Official source. Accessed 25 September 2026.
[183]
Väylävirasto, Ratatekniset ohjeet (RATO) 11: Radan päällysrakenne, 2024-06-10. Official source. Accessed 25 September 2026. Väyläviraston ohjeita 15/2024. Cited historical edition, replaced by version 2 on 1 December 2024.
[184]
Bane NOR, Teknisk regelverk: Overbygning/Bygging/Helsveist spor/Vedlegg/Prosedyre for nøytralisering, 2026-05-18. Official source. Accessed 25 September 2026.
[185]
Bane NOR, Teknisk regelverk: Overbygning/Bygging/Sporveksler, 2026-05-18. Official source. Accessed 25 September 2026.
[186]
Bane NOR, Teknisk regelverk: Overbygning/Prosjektering/Spor på bruer. Official source. Accessed 25 September 2026.
[187]
Norske tog, Type 74. Source. Accessed 25 September 2026.
[188]
European Committee for Standardization (CEN), EN 14587-1:2018: Railway applications - Infrastructure - Flash butt welding of new rails - Part 1: R220, R260, R260Mn, R320Cr, R350HT, R350LHT, R370CrHT and R400HT grade rails in a fixed plant, 2018. Source. Accessed 25 September 2026.
[189]
European Committee for Standardization (CEN), EN 14587-2:2024: Railway applications - Infrastructure - Flash butt welding of new rails - Part 2: R200, R220, R260, R260Mn, R320Cr, R350HT, R350LHT, R370CrHT and R400HT grade rails by mobile welding machines at sites other than a fixed plant, 2024. Source. Accessed 25 September 2026.
[190]
Klima- og miljødepartementet, Biocid - fornyet godkjenning av kreosot i PT8, 2023. EØS-notat, 11 May 2023. Source. Accessed 25 September 2026.
[191]
Getzner Werkstoffe, Under Sleeper Pads: Elasticity in Ballasted Track. Source. Accessed 25 September 2026.
[192]
Bane NOR, Ballast, 2024. Technical specification, revision 06, 1 June 2024. Source. Accessed 25 September 2026.
[193]
Miljødirektoratet, Disponering av jord og stein som ikke er forurenset. Source. Accessed 25 September 2026.
[194]
Plasser & Theurer, Tamping technology in detail. Source. Accessed 25 September 2026.
[195]
Plasser UK Ltd., RM 900: High output ballast cleaning system HOBCS for Network Rail. Source. Accessed 25 September 2026.
[196]
Bane NOR, Underbygning/Prosjektering og bygging/Stabilitet, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[197]
Norges vassdrags- og energidirektorat, Sikkerhet mot kvikkleireskred: Vurdering av områdestabilitet ved arealplanlegging og utbygging i områder med kvikkleire og andre jordarter med sprøbruddegenskaper, 2020. Veileder 1/2019, published December 2020. Source. Accessed 25 September 2026.
[198]
Bane NOR, Overbygning/Prosjektering/Sporets trasé, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[199]
European Committee for Standardization (CEN), EN 13803:2017: Railway applications - Track - Track alignment design parameters - Track gauges 1 435 mm and wider, 2017. Source. Accessed 25 September 2026.
[200]
European Railway Agency, Introduction to ETCS braking curves, 2020. ERA_ERTMS_040026, version 1.5, 12 August 2020. Source. Accessed 25 September 2026.
[201]
B. E. Croft, C. J. C. Jones, and D. J. Thompson, Modelling the effect of rail dampers on wheel–rail interaction forces and rail roughness growth rates, 2009. Journal of Sound and Vibration. DOI: 10.1016/j.jsv.2008.12.013. Source. Accessed 25 September 2026.
[202]
European Committee for Standardization (CEN), EN 15302:2021: Railway applications - Wheel-rail contact geometry parameters - Definitions and methods for evaluation, 2021. Source. Accessed 25 September 2026.
[203]
European Railway Agency, Specific procedures for running dynamics, 2013. ERA/TD/2013-01-INT, version 1.0, 11 February 2013. Source. Accessed 25 September 2026.
[204]
World Health Organization, Environmental noise, 2022. In: Compendium of WHO and other UN guidance on health and environment, 2022 update, chapter 11. WHO/HEP/ECH/EHD/22.01. Source. Accessed 25 September 2026.
[205]
International Union of Railways (UIC), Noise Focus, 2013. No. 2, June 2013. Source. Accessed 25 September 2026.
[206]
B. Ding, G. Squicciarini, D. Thompson, and R. Corradi, An assessment of mode-coupling and falling-friction mechanisms in railway curve squeal through a simplified approach, 2018. Journal of Sound and Vibration, vol. 423, pp. 126–140. DOI: 10.1016/j.jsv.2018.02.048. Source. Accessed 25 September 2026.
[207]
Bane NOR, Jernbanekompetanse: Støy og vibrasjoner. Source. Accessed 25 September 2026.
[208]
A. Quagliata, M. Ahearn, E. Boeker, C. Roof, L. Meister, and H. Singleton, Transit Noise and Vibration Impact Assessment Manual, 2018. Federal Transit Administration, FTA Report No. 0123, September 2018. Source. Accessed 25 September 2026.
[209]
M. Buba, S. Kersten, J. D. Schmid, M. Barany, T. Breitkreutz, M. Dogu, Y. Heggemann, and L. E. Roca Paz, Kooperationsprojekt der jungen DEGA: Entwicklung interaktiver Akustik-Apps für die Lehre in der Akustik, 2024. Proceedings of DAGA 2024. Source. Accessed 25 September 2026.
[210]
Bane NOR, Signal/Prosjektering/Generelle krav, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[211]
Bane NOR, Jernbanekompetanse: Generell beskrivelse av KL-anlegg. Source. Accessed 25 September 2026.
[212]
International Union of Railways (UIC), FRMCS: Future Railway Mobile Communication System. Source. Accessed 25 September 2026.
[213]
European Commission, Commission Implementing Regulation (EU) 2019/773 of 16 May 2019 on the technical specification for interoperability relating to the operation and traffic management subsystem of the rail system within the European Union and repealing Decision 2012/757/EU, 2019. Source. Accessed 25 September 2026.
[214]
Samferdselsdepartementet, Forskrift om gjennomføring av forordning (EU) 2023/1695 om tekniske spesifikasjoner for samtrafikk for styring, kontroll og signal på jernbanenettet (TSI CCS-forskriften), 2025. FOR-2025-03-14-450. Source. Accessed 25 September 2026.
[215]
European Commission, Commission Regulation (EU) No 1300/2014 of 18 November 2014 on the technical specifications for interoperability relating to accessibility of the Union’s rail system for persons with disabilities and persons with reduced mobility, 2014. Consolidated text dated 28 September 2023. Source. Accessed 25 September 2026.
[216]
Bane NOR, Overbygning/Prosjektering/Plattformer og spor på stasjoner, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[217]
Bane NOR, Kontaktledning/Vedlikehold/Kontaktledning, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[218]
Bane NOR, Jernbanekompetanse: Sporvekslers geometri. Source. Accessed 25 September 2026.
[219]
P. T. Torstensson, G. Squicciarini, M. Krüger, B. A. Pålsson, J. C. O. Nielsen, and D. J. Thompson, Wheel–rail impact loads and noise generated at railway crossings: Influence of vehicle speed and crossing dip angle, 2019. Journal of Sound and Vibration, vol. 456, pp. 119–136. DOI: 10.1016/j.jsv.2019.04.034. Source. Accessed 25 September 2026.
[220]
Bane NOR, Overbygning/Vedlikehold/Sporveksler, 2026. Teknisk regelverk, edition dated 18 May 2026. Source. Accessed 25 September 2026.
[221]
Bane NOR, Bane NOR Årsrapport 2024. Source. Accessed 25 September 2026.
[222]
A. W. Skempton, The bearing capacity of clays, 1951. Proceedings of the Building Research Congress, London, vol. 1, pp. 180–189. Reprinted in Selected Papers on Soil Mechanics, 1984, pp. 50–59. Publisher’s reprint. Accessed 25 September 2026.
[223]
T. Ursin, Railway Noise and Vibrations: Sources, propagation, assessment, mitigation, TBA4225, NTNU, 2026. Lecture presentation, 61 pages, title page dated 2 October 2026; PDF received 1 October 2026. Course teaching material. Unpublished measurement results and prospective project information are identified in the chapter.
[224]
Miljødirektoratet, M-2061: 9.5 Beregningsmetoder. Guidance to T-1442: recognised railway calculation methods and documentation of method choice and uncertainty. Source. Accessed 1 October 2026.
[225]
Direktoratet for byggkvalitet, TEK17 § 13-6: Lyd og vibrasjoner. Building regulations with guidance: satisfactory sound and vibration conditions; NS 8175:2012 and NS 8176:2017. Source. Accessed 1 October 2026.
[226]
European Commission, Commission Regulation (EU) No 1304/2014: TSI Noise, 2014. Consolidated version of 28 September 2023, including Regulations (EU) 2019/774 and 2023/1694. Articles 5a–5c and Annex 7.2.2, 7.4. Source. Accessed 1 October 2026.
[227]
European Union Agency for Railways, Noise TSI: Quieter routes. Official quieter-route overview and national implementation notes. Source. Accessed 1 October 2026.
[228]
International Union of Railways (UIC), Optimised Rail Pad Performance for Noise Reduction: Outcomes and Recommendations (LOWNOISEPAD project), 2023. Final report, ISBN 978-2-7461-3311-2, 108 pages. Executive summary p. 5 and conclusions p. 96. Official copy hosted by Trafikverket. Source. Accessed 1 October 2026.
[229]
Miljødirektoratet, Veileder til forurensningsforskriftens kapittel 5: § 5-4 Tiltaksgrenser for innendørs støy. Guidance on the indoor action threshold for existing buildings. Source. Accessed 1 October 2026.
[230]
Bane NOR, Hvorfor tuter toget?. Explanation of safety warnings at level crossings and the reduction of required horn use through crossing removal. Source. Accessed 1 October 2026.
[231]
European Commission, Commission Implementing Regulation (EU) 2024/327 repealing Implementing Regulation (EU) 2015/429, 2024. Repeal of the former noise-differentiated infrastructure charging scheme. Source. Accessed 1 October 2026.
[232]
Statens jernbanetilsyn, Forskrift om gjennomføring av den tekniske spesifikasjonen for samtrafikkevne som gjelder for delsystemet «rullende materiell – støy» (TSI NOISE-forskriften), 2015. Norwegian implementation, as amended, including the 2025 implementation of Regulation (EU) 2023/1694. Source. Accessed 1 October 2026.
[233]
H. G. Jonasson and S. Storeheier, Nord 2000: New Nordic Prediction Method for Rail Traffic Noise, 2001. SP Report 2001:11, version 1.0, 21 December 2001. ISBN 91-7848-854-0. Source. Accessed 1 October 2026.
[234]
Naturvårdsverket and Banverket, Buller från spårburen trafik: Nordisk beräkningsmodell, 1999. Report 4935, Swedish presentation of the 1996 Nordic railway-noise model; copy printed January 1999. ISBN 91-620-4935-6. Source. Accessed 1 October 2026.
[235]
European Commission, Commission Directive (EU) 2015/996 establishing common noise assessment methods, 2015. CNOSSOS-EU, with corrigenda and subsequent amendments, including Delegated Directive (EU) 2021/1226. See Directive 2002/49/EC, Annex II, sections 2.1.1 and 2.3. Source. Accessed 1 October 2026.
[236]
International Electrotechnical Commission, IEC 61672-1:2013: Electroacoustics - Sound level meters - Part 1: Specifications, edition 2.0, 30 September 2013. Official record. Accessed 1 October 2026.
[237]
L. Braile, Seismic Wave Demonstrations and Animations, Purdue University, December 2004, updated February 2010. Original P, S, Rayleigh and Love animations; the creator permits non-commercial reproduction and use. Original source. Accessed 1 October 2026.
[238]
N. Vincent, P. Bouvet, D. J. Thompson and P. E. Gautier, “Theoretical optimization of track components to reduce rolling noise,” Journal of Sound and Vibration, vol. 193, no. 1, pp. 161–171, 1996. DOI: 10.1006/jsvi.1996.0255. Institutional record. Accessed 1 October 2026.
[239]
US Environmental Protection Agency, Seismic Velocities, updated 6 January 2026. Source. Accessed 1 October 2026.
[240]
D. J. Thompson, B. Hemsworth and N. Vincent, “Experimental validation of the TWINS prediction program for rolling noise, Part 1: Description of the model and method,” Journal of Sound and Vibration, vol. 193, no. 1, pp. 123–135, 1996. DOI: 10.1006/jsvi.1996.0252. Publisher record. Accessed 1 October 2026.
[241]
D. J. Thompson, C. J. C. Jones, T. P. Waters and D. Farrington, “A tuned damping device for reducing noise from railway track,” Applied Acoustics, vol. 68, pp. 43–57, 2007. DOI: 10.1016/j.apacoust.2006.05.001. Public author-institution PDF. Accessed 1 October 2026.
[242]
J. Nielsen, O. Lundberg and N. Renard, Performance report of applied measures – Malmö. Part 1: In-field measurements of the influence of combined wheel and rail damping on railway noise, QCITY Deliverable D5.9, Part 1, 30 January 2009. Appendix 1 (PDF p. 42), Table 9.4 and sections 8–9. Public archive of the original report. Accessed 1 October 2026.
[243]
A. Pieringer, W. Kropp and J. C. O. Nielsen, “The influence of contact modelling on simulated wheel/rail interaction due to wheel flats,” Wear, vol. 314, no. 1–2, pp. 273–281, 2014. DOI: 10.1016/j.wear.2013.12.005. Institutional record. Accessed 6 October 2026.
[244]
Bane NOR, InterCity-prosjektet Dovrebanen, Brumunddal–Moelv: Konsekvensutredning – fagrapport støy og vibrasjoner, ICD-10-A-23005, rev. 01A, 4 March 2022, § 4.5, p. 23. The report identifies the ordering of avoidance, reduction and mitigation. The former online PDF was unavailable at review on 6 October 2026.
[245]
Bane NOR, Signal/Prosjektering/Forriglingsutrustning. Teknisk regelverk, approved edition dated 18 May 2026. Official source. Accessed 7 October 2026.
[246]
Bane NOR, Signal/Prosjektering/Sporveksel- og sporsperreutrustning. Teknisk regelverk, approved edition dated 18 May 2026. Official source. Accessed 7 October 2026.
[247]
Bane NOR, Signal/Prosjektering/Togdeteksjon. Teknisk regelverk, current approved web chapter. Official source. Accessed 7 October 2026.
[248]
Bane NOR, Trafikkregler for jernbanenettet: Kapittel 1, generelle bestemmelser og definisjoner. Operativt regelverk, section 1.9. Official source. Accessed 7 October 2026.
[249]
Bane NOR, Ny kontrollhåndbok for nytt signalsystem ERTMS. Central signalling equipment and trackside object controllers. Official source. Accessed 7 October 2026.
[250]
Bane NOR, Kapasitet på jernbane. Jernbanekompetanse, block occupation and headway explanation. Official source. Accessed 7 October 2026.
[251]
Bane NOR, TABELL:Sikkerhetsavstander. Teknisk regelverk, approved edition dated 18 May 2026, revision 137854. Conditions and footnotes apply. Official source. Accessed 7 October 2026.
[252]
Bane NOR, TRV:02464: Dekningsgivende objekt. Current requirement in Overbygning/Prosjektering/Sporets trasé. Official source. Accessed 7 October 2026.
[253]
Bane NOR, ATC-håndbok: Overvåkingsgrader og områder. National ATC supervision in non-equipped, DATC and FATC areas. Official source. Accessed 8 October 2026.
[254]
Bane NOR, Network Statement 2026: 2.3.11 Trafikkstyring. Dispatcher areas, traffic-control centres and operating methods for timetable period R26. Official source. Accessed 8 October 2026.
[255]
Bane NOR, Driftsform og deteksjonssystem. Operativt regelverk, updated 27 May 2025. Links to current SJN operating-method and detection-system lists. Official source. Accessed 8 October 2026.
[256]
Mangoe, Clear track circuit, 2006. Original drawing and attribution. CC BY-SA 3.0. Shown as in the presentation, with the “Proceed” label; slide margins and footer cropped. Accessed 8 October 2026.
[257]
Bane NOR, Plattformer og lasteramper mot spor i kurver. Technical-regulation appendix, approved edition dated 18 May 2026. Platform offsets, cant relations, transition reaches and turnout cases. Official source. Accessed 20 October 2026.
[258]
Bane NOR, Network Statement 2026: 2.3.4 Lasteprofiler. International and national profiles and route-specific combined-transport codification for R26. Official source. Accessed 20 October 2026.
[259]
UIC, IRS 50596-6: Conditions for coding intermodal transport units in combined transport, combined transport lines and wagons, 3rd edition, 1 October 2024, ISBN 978-2-7461-3448-5. Publisher record. Accessed 20 October 2026.